One product line from brief to delivered assets, with the decisions and the dead ends left in.
Free with an account
Membership is free: an account opens all 86 script pages. The Lab, Studio Canvas and the paid guides need the $99 pass, paid once. Already signed in on this browser? The page opens by itself.
The shape
Most write-ups show the finished path. The wrong turns are the useful part.
A campaign looks linear in retrospect and is not while you are in it. What follows is the actual sequence — brief, extraction, direction, production, failure, recovery, delivery — with the parts that wasted time included, because those are the parts worth learning from.
The specifics belong to one job. The shape repeats: roughly a fifth of the effort in understanding, a fifth in establishing the look, a fifth in production, and the remaining two fifths in the checking, fixing and delivering that nobody plans for.
Budget accordingly and the job is calm. Budget for production only and it is not.
Days one and two
No images yet. This is the part people skip and pay for later.
Read the brief for hard constraints, stated negatives, and references with a note on what is being referenced. Turn it into one page and send it back for confirmation.
In parallel, build the brand file: palette, tone, permitted locations, guardrails, and a preservation list per product. Ask for reference photography — multiple angles per item — while doing it, because that request has a lead time and blocks everything downstream.
The confirmation reply is worth waiting for. Starting production against an unconfirmed reading is the most expensive risk in the job, and it costs one day to remove.
Days three and four
Everything downstream inherits from one image, so it gets disproportionate effort.
Produce one representative frame to a finished standard. Not the hero — something typical, whose lighting and treatment you want everywhere.
This is where the first real dead end usually appears. A treatment that read well on a board turns out not to survive the product: too dark to see the material, too stylised to keep the object honest, too busy for the lower third the layout needs.
Recognising that early is the whole point of anchoring. Discovering it after twenty frames means twenty frames to redo, and the temptation at that stage is to keep them and hope, which never works.
Lock the anchor, record its prompt and settings, and treat it as the specification for everything after.
Days five to seven
Assembled prompts, batch generation, and a check that blocks.
Every remaining frame is sequence block plus scene block plus product block, with the anchor attached as a style reference. Assembled, not typed.
Run in batches and review in batches, against the preservation list and the guardrails rather than on impression. The check should refuse — wrong ratio, missing count, an attribute changed — before anything reaches a review folder.
Expect a hit rate well below what a single good frame suggests. Producing forty to select twenty is normal, and planning for it removes the panic when the first batch comes back mixed.
The failure to plan for
One product will be significantly harder than the rest — a transparent material, a complex fastening, fine printing. Identify it on day three and decide then whether it is generated, composited or photographed. Leaving it until production means it holds up delivery.
Day eight
Twenty individually good frames are not a campaign until they are graded as one.
Bring every selected frame into one session and match them: exposure, balance, contrast, as a group. Small differences that were invisible frame by frame are obvious in a grid, and the grid is how the client will see them.
This is also the moment to catch the frame that does not belong. There is usually one — technically fine, subtly from a different world. It reads as an error in a set even though it would be fine alone. Replace it or cut it.
Half a day here does more for the campaign's coherence than any amount of additional generation.
Day nine and after
Structured so the notes land as edits.
Deliver with the folder structure, the naming convention, and the notes page. Include the masters and the recipes, even though nobody asked.
Then expect the round. Sort the notes into adjustments and structural changes, do all the adjustments first, and quote the structural ones separately. Most of what arrives will be adjustments, and delivering those quickly resolves a surprising number of the structural notes without touching them.
What makes this round cheap is entirely decisions made in week one: layered production, saved recipes, a written specification to check against. None of it is visible in the finished work, and all of it is why the job ended on time.